The FUE procedure for "preliminary fire report request" is updated

In the lasteres In the past few weeks, changes have occurred in the processing of different FUE procedures, requiring adaptations to the e-TRAM solution. The most important change has occurred in the “Request for a prior fire report”, but adjustments and developments have been made in different procedures. Specifically:

  • Request prior report on fires
  • Communication of start and substantial modification of activity in an establishment with technical certificate
  • Communication of start and substantial modification of activity in an establishment with technical project and certificate

Below are the main changes made. You will find them all available in e-TRAM automatically from May 16. Next we go into detail.

Request prior report on fires

From March 1, 2024, the processing of fire prevention requests is integrated into the ecosystem of the Business Single Window (FUE), so that the owner can directly process the request for the prevention report to the General Directorate of Prevention, Fire Extinguishing and Rescue (DGPEIS), thus speeding up the administrative process.

At the outset, the Generalitat de Catalunya has created a new specific procedure with the following name: Fire prevention and safety report

This procedure can therefore be processed from the portal of the Generalitat, but the current municipal procedure (via e-TRAM) is also maintained with some adjustments, in order to comply in the event that the owner has to issue a building permit or activity license, as provided for in fire regulations.

If you want to check the details of the different changes that have occurred in this procedure, you can check the details at next link. We also send you the reference to the type sheet model available at Company Channel (link to the file type document. Source: Canal Empresa).

Communication of start and substantial modification of activity in an establishment with technical project and certificate

For these procedures, the changes that have occurred are the following:

In the case of councils that have e-TRAM 2.0, these changes will be made automatically.

In the case of councils with their own solutions, these changes will have to be adjusted in their file and processing form, as well as in the XML they exchange with Consorci AOC, while following the instructions of the file model available in the detail of file type document. Source: Canal Empresa.

Communication of start and substantial modification of activity in an establishment with technical certificate

For this procedure, as for the previous one, the information relating to the exceptions in the case of rural tourism tourist establishments and housing for tourist use has also been updated in the procedure sheet, as has also been incorporated additional information into the form itself.

In the case of councils that have e-TRAM 2.0, these changes will be made automatically.

In the case of councils with their own solutions, these changes will have to be adjusted in their file and processing form, as well as in the XML they exchange with Consorci AOC, while following the instructions of the file model available in the detail of file type document. Source: Canal Empresa.